Features /
1.High pressure hydraulic jetting and fracturing are combined.Perforation is not necessary. No compacted zone.
2.High pressure jet flow creates unique hydraulic isolation. Running a packer is not necessary. 3.Suitable for all well types, such as vertical and horizontal wells. 4.Suitable for several completion methods, such as casing completion, openhole completion and screen pipe completion. |
Size (mm) |
OD (mm) |
stage |
Up Box |
Down Box |
114.3 |
88 |
3-4 |
2 3/8 EU |
2 3/8 EU |
127.0 |
98 |
5-6 |
2 7/8 NU |
2 7/8 NU |
139.7 |
108 |
8-11 |
2 7/8 EU |
2 7/8 EU |
177.8 |
140 |
14-20 |
3 1/2 NU |
3 1/2 NU |
Copyright(C) Shelfoil Petroleum Equipment & Services Co., Ltd.
Address: #1286, Changxing Road, Economic Development Zone, Dezhou, Shandong, China
Tel: +86-534-2670699 Fax: +86-534-2566056 E-mail:info.sripe@sinopec.com